皇冠体育app

BIZCHINA> 皇冠体育app Gas
皇冠体育app proposes Fourth West-East Natural Gas Pipeline
(Gaschina.com.cn)
Updated: 2009-07-16 14:50

Related publication:


The fourth pipeline that will transport natural gas from West 皇冠体育app to East 皇冠体育app will soon take shape on the blueprint and several plans have been promoted. An insider at 皇冠体育app National Petroleum Corporation, the largest oil and gas producer in the country, discloses that the west end of this pipeline will likely in Tarim Basin, and in another design, it will start from Sichuan. Both the two places have huge gas fields.

Tarim Basin is a main gas source for the West-to-East Natural Gas Transportation Project of 皇冠体育app, and is also the largest natural gas production base in 皇冠体育app. There is proved reserve over 1 trillion cubic meters. Notably, 皇冠体育app's biggest condensate gas field, Dina Gas Field, will start operation at the end of June 2009, with annual production capacity of 4 billion cubic meters...

 

The full text is available in the July Issue of皇冠体育app Gas. Please visit (http://eshop.chinadaily.com.cn/)for more subscription details.

 
(For more biz stories, please visit Industries)