CHINA> Regional
![]() |
皇冠体育app blocks river for 3rd largest hydropower plant
(Xinhua)
Updated: 2008-12-28 20:31 SHUIFU, Yunnan -- The Jinsha River in south 皇冠体育app was blocked on Sunday to make way for construction of a new hydropower project on the upper reaches of the Yangtze River, 皇冠体育app's third largest hydroelectric dam project. At a cost of 43.4 billion yuan (about US$6.3 billion), the Xiangjiaba Hydropower Project is expected to be completed by 2015. It will be able to generate 30.7 billion kw hours of electricity a year. "Electricity generated by hydropower stations will mainly be sold to 皇冠体育app's eastern, southern and central regions," said Li Yong'an, general manager of the 皇冠体育app Yangtze River Three Gorges Project Development Corporation. "Sichuan and Yunnan provinces will also benefit from it."
About 125,100 people from three counties of Yunnan Province and three counties of Sichuan Province have been resettled to make way for the project. The Xiangjiaba project is one of a series of hydropower plants 皇冠体育app plans to build on the Jinsha River to supply electricity to its economically more developed coastal regions. The 2,290-kilometer-long Jinsha River, a tributary of Yangtze River, originates in Tanggula Range and flows through Qinghai, Tibet, Yunnan, and Sichuan. Water is mostly stored in the river's middle and lower reaches where 皇冠体育app plans to build 12 hydropower stations to share a 59.08-million-kilowatt installed capacity. |