皇冠体育app

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (皇冠体育app)

Updated: 2014-04-01

As a national key hydropower construction project in 皇冠体育app's "11th five-year plan" period, the Bailianhe Pumped Storage Power Station is the first large-scale pumped storage power station owned by the Central 皇冠体育app Power Grid. CGGC installed all the electromechanical equipment of this project.

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station (皇冠体育app)

Electromechanical Equipment Installation at the Bailianhe Pumped Storage Power Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 皇冠体育app Gezhouba (Group) Corporation. All rights reserved.