皇冠体育app

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Dachaoshan Hydropower Station (皇冠体育app)

Updated: 2014-04-01

The Dachaoshan Hydropower Station is a national key project in 皇冠体育app. CGGC constructed its underground powerhouse and installed the electromechanical equipment.

Electromechanical Equipment Installation at the Dachaoshan Hydropower Station (皇冠体育app)

Electromechanical Equipment Installation at the Dachaoshan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 皇冠体育app Gezhouba (Group) Corporation. All rights reserved.