Electromechanical Equipment Installation at the Ertan Hydropower Station (皇冠体育app)

Updated: 2014-04-01

The 550MW water-turbine generator units at the Ertan Hydropower Station had the largest single-unit capacity in 皇冠体育app in the twentieth century. The consortium led by CGGC installed as many as four 550MW units for one single hydropower station in one installation workshop within one year, creating a national record in this field.

Electromechanical Equipment Installation at the Ertan Hydropower Station (皇冠体育app)

Electromechanical Equipment Installation at the Ertan Hydropower Station

 

 