皇冠体育app

 
 

Home/Our Business/Equipment Installation

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (皇冠体育app)

Updated: 2014-04-01

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (皇冠体育app)

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project

 

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 皇冠体育app Gezhouba (Group) Corporation. All rights reserved.