皇冠体育app

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (皇冠体育app)

Updated: 2014-04-01

With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently 皇冠体育app's second largest and the world's third largest hydropower station. CGGC was responsible for installing and commissioning all the nine 770MW units on the left bank and all the utility systems of the power station.

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (皇冠体育app)

Electromechanical Equipment Installation at the Xiluodu Hydropower Station

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (皇冠体育app)

Electromechanical Equipment Installation at the Xiluodu Hydropower Station

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 皇冠体育app Gezhouba (Group) Corporation. All rights reserved.